Load Out Subsea
All Subsea Manifolds, Super Duplex Pipe Spooling and jumpers fabricated undertaken in workshop 6 100%
Project on schedule No LTI Load out all performed on time
Client Timas and Premiere Oil (BIGP)
All Subsea Manifolds, Super Duplex Pipe Spooling and jumpers fabricated undertaken in workshop 6 100%
Project on schedule No LTI Load out all performed on time
Client Timas and Premiere Oil (BIGP)
The latest project just delivered 145 metre x 1100 ton pipe lay stinger load out 06/01/16 full EPC contract from PT Citra Tubindo Enginering please see full details on our webpage
On 8 April 2015 PT. Citra Tubindo Engineering (CTE) had an opening ceremony for their new warehouse which will be used to fabricate the Stinger an ocean pipe lying equipment which hangs off the back of pipe lying ship.