Error message

Notice: unserialize(): Error at offset 17 of 21 bytes in variable_initialize() (line 1202 of /home/webserver/website/includes/bootstrap.inc).

SSPU PROCESS PACKAGE - TDAE

SMALL SCALE PRODUCTION UNIT (SSPU) PROCESS PACKAGE - TDAE PLANT PROJECT

The Project For CTE description is as follows:

1. Client Name: PT. ENERCO RPO INTERNASIONAL

2. Fabrication Year: 2018

3. Weight: TBA

4. Specification: Fabrication and Installation of Small Scale Production Unit (SSPU) and responsible to execute the purchase items based on master purchase list CTE-ENERCO. (Steel Stuctural, Piping, Mechanical Static Equipment, Rotating Equipment, Electrical & Instumentation)